Close Menu
thewitness.com.au
  • Home
  • Latest
  • National News
  • International News
  • Sports
  • Business & Economy
  • Politics
  • Technology
  • Entertainment

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

The one thing Wests Tigers need to do to keep Jarome Luai

October 13, 2025

Prince Andrew told Epstein ‘we are in this together’

October 13, 2025

Video: GFG26 NSW T2 Tea Cafe of the Year Winner: Yum Yum Bakery

October 13, 2025
Facebook X (Twitter) Instagram Threads
thewitness.com.au
Facebook X (Twitter) Instagram
Subscribe
  • Home
  • Latest
  • National News
  • International News
  • Sports
  • Business & Economy
  • Politics
  • Technology
  • Entertainment
thewitness.com.au
Home»Latest»Wind farm construction needs to quadruple to hit goal
Latest

Wind farm construction needs to quadruple to hit goal

info@thewitness.com.auBy info@thewitness.com.auSeptember 19, 2025No Comments3 Mins Read
Wind farm construction needs to quadruple to hit goal
Share
Facebook Twitter Pinterest Threads Bluesky Copy Link


“That’s not a political promise. It’s a statement of modelling by expert agencies,” Bowen said.

Opposition Leader Sussan Ley seized on the PM’s answer, claiming he dodged the question because “Albanese has no faith in his own promise to bring down power prices”.

Anthony Albanese says Australia’s 2035 emissions reduction target is “responsible” and “supported by science”.

Anthony Albanese says Australia’s 2035 emissions reduction target is “responsible” and “supported by science”.Credit: Dominic Lorrimer

While the authority has said the government could reach its target by forcing greater emissions reduction in mining, agriculture and manufacturing, as well as banning native forest logging, the government has not revealed all the details of its pathway to the new target.

But the climate target report released on Thursday has confirmed the source of around half of its required emissions reductions – replacing polluting coal plants by boosting renewables to supply 95 per cent of electricity to the grid within 10 years.

Wind farms must quadruple by 2035, due to the need for an energy source that can power the grid when the sun isn’t shining, to supplement the huge volume of solar panels.

The biggest wind farm under construction is known as Golden Plains, near Geelong in Victoria. It will boast 122 turbines to have an electricity generation capacity of 1.2 gigawatts.

Senior renewables analyst for energy consultancy Rystad, David Dixon, said the equivalent of four Golden Plains must be added to the grid each year until 2035, but the current rate of construction is too slow.

“We’ve only ever started construction on more than 2 gigawatts in a single year, and all other years have been below that,” Dixon said, while adding that the government should be commended for setting a goal that could help drive the greatest achievement possible.

“There are many countries around the world that set targets that are easily achievable. We’ve gone the opposite way and set a target that to reach would have to go at record pace at a global level.”

Renewable energy investors told this masthead that while it was possible for the industry to reach this goal, state and federal governments must execute a number of major reforms that have sat in the too-hard basket for years.

Loading

The most controversial measure, they say, is expanding the compulsory acquisition of private property, which would infuriate farmers opposed to development on their land, to remove the roadblocks to building over 4000 kilometres of new transmission lines by 2030.

The completion date for the $3.3 billion VNI West transmission line has blown out from 2028 to 2030. Initially expected to cost $3.9 billion, its cost estimate is now between $7.6 billion and $11.4 billion, according to the Australian Energy Market Operator.

The EnergyConnect link between South Australia, Victoria, and NSW has been delayed from 2026 to 2027 – the cost has also blown out from $2.3 billion to $4.1 billion, and the expected completion of Marinus Link from Tasmania to the mainland has shifted from 2030 to 2032.

Clean Energy Investor Group chief executive Richie Merzian, who represents most of the major investors in Australian renewables, said state and federal planning regulations, which add years of delay to projects, need an urgent overhaul.

“We’re not on track right now, but we can be,” he said.

“It’s all within our means to address, the question is whether we have the conviction to do it.”

Share. Facebook Twitter Pinterest Bluesky Threads Tumblr Telegram Email
info@thewitness.com.au
  • Website

Related Posts

The one thing Wests Tigers need to do to keep Jarome Luai

October 13, 2025

Prince Andrew told Epstein ‘we are in this together’

October 13, 2025

Video: GFG26 NSW T2 Tea Cafe of the Year Winner: Yum Yum Bakery

October 13, 2025
Add A Comment
Leave A Reply Cancel Reply

Demo
Top Posts

Widower, doctor call for disgraced surgeon to be stripped of NSW Australian of the Year award

September 14, 202511 Views

Sex offender Daniel Hume’s successful application sparks controversy

September 1, 20257 Views

To join urgent meeting on Ukraine crisis with Emmanuel Macron and NATO leaders

September 3, 20254 Views
Don't Miss

The one thing Wests Tigers need to do to keep Jarome Luai

By info@thewitness.com.auOctober 13, 2025

Having had time to reflect on the Tigers’ campaign, he said 2025 could not be…

Prince Andrew told Epstein ‘we are in this together’

October 13, 2025

Video: GFG26 NSW T2 Tea Cafe of the Year Winner: Yum Yum Bakery

October 13, 2025

Locksley leaps onto upgraded OTCQX market as US scrambles for antimony

October 13, 2025
Stay In Touch
  • Facebook
  • YouTube
  • TikTok
  • WhatsApp
  • Twitter
  • Instagram
Top Trending
Demo
Most Popular

Widower, doctor call for disgraced surgeon to be stripped of NSW Australian of the Year award

September 14, 202511 Views

Sex offender Daniel Hume’s successful application sparks controversy

September 1, 20257 Views

To join urgent meeting on Ukraine crisis with Emmanuel Macron and NATO leaders

September 3, 20254 Views
Our Picks

The one thing Wests Tigers need to do to keep Jarome Luai

October 13, 2025

Prince Andrew told Epstein ‘we are in this together’

October 13, 2025

Video: GFG26 NSW T2 Tea Cafe of the Year Winner: Yum Yum Bakery

October 13, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Facebook X (Twitter) Instagram Pinterest
  • Home
© 2025 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.