Close Menu
thewitness.com.au
  • Home
  • Latest
  • National News
  • International News
  • Sports
  • Business & Economy
  • Politics
  • Technology
  • Entertainment

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

De Minaur wins Rotterdam title

February 15, 2026

Goldman Sachs lawyer Kathy Ruemmler to resign

February 15, 2026

Camila Mendes reveals how she prepared for her role in ‘Idiotka’

February 15, 2026
Facebook X (Twitter) Instagram Threads
thewitness.com.au
Facebook X (Twitter) Instagram
Subscribe
  • Home
  • Latest
  • National News
  • International News
  • Sports
  • Business & Economy
  • Politics
  • Technology
  • Entertainment
thewitness.com.au
Home»Business & Economy»Dateline drills epic gold widths in California
Business & Economy

Dateline drills epic gold widths in California

info@thewitness.com.auBy info@thewitness.com.auJanuary 12, 2026No Comments2 Mins Read
Dateline drills epic gold widths in California
Share
Facebook Twitter Pinterest Threads Bluesky Copy Link



Dateline drills epic gold widths in California

Dateline says starting mining beneath the North Pit could materially enhance production in the early years, with the area pencilled in as the first mining focus under the development plan. The pit is already partially developed, effectively stripping away years of pre-strip and access work and allowing faster, lower-cost access to ore.

Recent drilling has also confirmed thick, continuous mineralisation sitting directly below the pit floor. By bringing these wide, near-surface zones into the schedule early, the operation could deliver strong tonnages at consistent grades, supporting a smooth ramp-up and helping the plant reach nameplate throughput sooner.

The company’s drilling program is part of an ongoing campaign to support Dateline’s bankable feasibility study and progressively upgrade the resource into higher-confidence categories. The project already hosts 27.1 million tonnes grading 1.26g/t gold for 1.1 million ounces, with more than 67 per cent classified as measured and indicated.

The project sits within the prolific Walker Lane Trend in eastern San Bernardino County, less than 10 kilometres from the Mountain Pass rare earths mine. The district has a rich mining pedigree dating back to the Californian gold rush of 1848 and hosts multiple multi-million-ounce gold deposits, along with scattered fluorite, antimony and tungsten prospects.

Historically, exploration focused almost exclusively on two known breccia pipes, with 1.4 million ounces of gold defined in the upper 250 metres, including 344,000 ounces already mined and the existing 1.1-million-ounce resource.

Notably, gold occurs predominantly as free gold with minor silver and is closely associated with sulphide mineralisation, chiefly pyrite. It typically resides in fractures within pyrite or along grain boundaries, a deportment style that is easy for efficient downstream processing.

Economically, the project carries a post-tax net present value of US$550 million (A$850 million) and an internal rate of return above 60 per cent, based on a conservative gold price of US$2900 per ounce. With gold now trading well above US$4000 per ounce, those metrics could climb sharply as feasibility work progresses.

Dateline has forecast total production of 635,000 ounces of gold over an initial 8.3-year mine life, with average annual output of 71,000 ounces grading 1.3g/t gold and a recovery rate of 92 per cent.

With assays continuing to flow and deeper drilling ahead, the latest results reinforce the open-at-depth potential beneath the pits and point toward a larger, higher-quality resource base as the California gold story continues to unfold.

Is your ASX-listed company doing something interesting? Contact: mattbirney@bullsnbears.com.au

Share. Facebook Twitter Pinterest Bluesky Threads Tumblr Telegram Email
info@thewitness.com.au
  • Website

Related Posts

De Minaur wins Rotterdam title

February 15, 2026

Goldman Sachs lawyer Kathy Ruemmler to resign

February 15, 2026

Camila Mendes reveals how she prepared for her role in ‘Idiotka’

February 15, 2026
Add A Comment
Leave A Reply Cancel Reply

Demo
Top Posts

Inside the bitter fight for ownership of a popular sports website

October 23, 202597 Views

Man on warrant found hiding in a drain in NSW central west

October 23, 202542 Views

Police believe ‘Penthouse Syndicate’ built Sydney property empire from defrauded millions

September 24, 202538 Views
Don't Miss

De Minaur wins Rotterdam title

By info@thewitness.com.auFebruary 15, 2026

Aussie tennis star Alex de Minaur wins the Rotterdam title after previously losing the final…

Goldman Sachs lawyer Kathy Ruemmler to resign

February 15, 2026

Camila Mendes reveals how she prepared for her role in ‘Idiotka’

February 15, 2026

Popular support for One Nation surges, draws level with Coalition; Shift in US naval strategy signals progress for AUKUS submarines

February 15, 2026
Stay In Touch
  • Facebook
  • YouTube
  • TikTok
  • WhatsApp
  • Twitter
  • Instagram
Top Trending
Demo
Most Popular

Inside the bitter fight for ownership of a popular sports website

October 23, 202597 Views

Man on warrant found hiding in a drain in NSW central west

October 23, 202542 Views

Police believe ‘Penthouse Syndicate’ built Sydney property empire from defrauded millions

September 24, 202538 Views
Our Picks

De Minaur wins Rotterdam title

February 15, 2026

Goldman Sachs lawyer Kathy Ruemmler to resign

February 15, 2026

Camila Mendes reveals how she prepared for her role in ‘Idiotka’

February 15, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Facebook X (Twitter) Instagram Pinterest
  • Home
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.